MAINTENANCE AND SUPPLIES REPLACEMENT
4-4 Sysmex KX-21 Operator’s Manual -- Revised October 1998
3. DAILY MAINTENANCE AND PROCEDURE
3.1 Clean TD Chamber and Diluted Sample Line (Shutdown)
By executing shutdown, the transducer chamber and diluted sample line are cleaned.
Perform shutdown after completion of the day's work, and also at least once every 24 hours
when this instrument is used continuously.
(1) Press [SHUTDOWN] key in the Ready status. The Shutdown screen appears.
3:Cancel
*
Shutdown
*
Aspirate CELLCLEAN.
It will take approx. 5 minutes.
Ready
Figure 4-3-1: Shutdown Screen
NOTE: • When [3] key is pressed, shutdown is canceled and the Analysis
screen returns.
(2) In executing shutdown, set CELLCLEAN to the sample probe and press the start
switch in that status. While "Aspirating" is being displayed on the screen, keep
holding CELLCLEAN in the same state.
Start Switch
Figure 4-3-2: Pressing the Start Switch