output |
Detailed table of contents on the following pages
General description
A Manufacturer
B Name of machines
C Declaration of Conformity - example
D General descriptions, dangers and warnings
E Drawings, diagrams, guides and instructions for the use, maintenance and repair
F Employees in charge of operation/control/maintenance
G Intended use and range of applications
H Unintended use and misuse – inappropriate applications for the machine
Installation
I Instructions for unloading on the site as well as installation and connection
J Installation and assembly instructions for reduction of noise and vibration emissions
Start-up, adjustments and operation
K Start-up, adjustments, use, commissioning and unit in hipernation
L Information about the residual risks
M Instructions on the protective measures during repair and maintenance
N The essential characteristics of tools which may be fitted to the machinery
Machine stability
O The conditions of stability during use, transportation, assembly, dismantling when out of service
P Instructions for machinery where these are regularly to be transported
Breakdown
Q The operating method to be followed in the event of breakdown. Safe restart.
Maintenance
R Adjustment and maintenance operations
S Instructions to enable adjustment and maintenance safely
T The specifications of the spare parts to be used, when these affect the health and safety of operators
Noise
U Information on airborne noise emissions exceeding 70 dB(A)
Annexes
1 Declaration of conformity with production number (in separate cover)
2 Technical data – unique data for every unit (in separate cover)
3 Spare part list (in separate cover)
4 Assembly of base frame – height 118 mm for unit sizes 10 – 18
5 Assembly of base frame – height 118 mm for unit sizes 20 – 31
6 Assembly of base frame – height 218 mm for unit sizes 10 – 18
7 Assembly of base frame – height 218 mm for unit sizes 20 – 31
8 Installation of steel roof in the sizes 10 – 31
9 Speed control for rotor and assembly of divided rotor
10 Reversible heat pump unit (in separate cover, if heat pump was delivered)
11 Menu for internal controller in the heat pump unit (in separate cover, if heat pump was delivered)
12 Connection of fan motor and set-up manual for frequency converter
13 Commissioning protocol – proposal (in separate cover)
14 Report with data from final functional test on the Systemair factory (in separate cover, if control system was
delivered)
15 Short description of main components in the control system
16 Wiring diagram (in separate cover, if control system was delivered)
17 Operator’s guide (how to use the Systemair control panel) (in separate cover, if control system was delivered)