5.2. MAINTENANCE PLAN .
Before starting any operation, the winch must be checked visually and functionally:
 All nuts and screws must be screwed tightly
 There should be no mechanical damages
 All safety devices are installed on the connecting parts of the winch
 The PTO shaft is correctly connected and secured by the safety chain
 The bottom links of the tractor are correctly fixed and prevent the winch from moving
 horizontally
 The clutch is operating properly
 Brake band is operating properly
 The wire rope release power is set correctly
 Remove all faults and deficiencies before staring the operation
WHAT to do? WHEN?
HOW?
 Release the rope and coil it tightly onto the
drum,
 Check if the wire rope is undamaged,
 Check if the wire rope is fixed properly
When using a new winch
When the wire rope is loose on the
drum
Visually
Ch.: 4.4.1.
 Checking and tightening of the chain
Every 48 hours of operation Ch.: 4.8.
 Clutch plates replacement
When necessary
 Brake band replacement
When necessary
Lubrication
(Figure:11)
A Cable pulley’s bearing No lubrication
B
Drive chain Every 48 hours of operation Chain
lubrication
spray
C
The upper and lower pulley
beds and other sliding
elements.
At least once a month Lithium
grease
oil
D
Wire rope Once a month Lithium
grease
E
Small pulleys’ bearings Before setting the pulling power Oil, spray
Cleaning the framework interior
Every 100 hours of operation or more
frequently in case of harsh operating
conditions