3.1.4 Unpacking inspection
When the equipment arrives at the installation site, loading and unloading should be carried out
according to the rules and regulations, to prevent it from being exposed to sun and rain.
Before unpacking, the total number of packages shall be indicated according to the shipping list
attached to each package, and the case shall be checked for good condition.
In the process of unpacking, handle it carefully and protect the surface coating of the object.
Open the package, the installation personnel should read the technical documents, verify the list,
according to the configuration table and packing list, ensure objects are complete and intact. If
the internal packing is damaged, it should be examined and recorded in detail.
Packing list is as follows:
Table 3-2
48
V/
105A
h
482.6×450×133.4mm
Orange
/L165mm
(Hole Center Distance)
Communication
parallel cable
Bla
ck
/L30
0mm
/Double
RJ45 plu
g
Communication
cable-to inverter
Black
/L2000mm /Double
RJ45 plug