EasyManua.ls Logo

TECNA PROVASET T3LPF - Page 52

Default Icon
101 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PROVASET T3LPF REV.20210610
52
Filling phase T1:
the external valve V3 is closed, the internal valve V1 is open;
• 
• PR * (RVP% / 100);
Valve advance

P1 at the beginning
of the next settling phase T2.
The valve advance time is programmed in the parameter AV1; typical value is 1 s.
Pressure P1
closed, to the external valve V3, still closed.
RPv Test pressure regulator
Pv Regulated pressure
 Flow sensor
V1 Internal valve
V2 Internal valve
PR Test pressure
S Discharge connection
 Master leak connection
TEST Output connection to the test cir-
cuit
Vr Filling volume
V3 External valve
J Component being tested or in test
chamber (bell) with the component
being tested inside
 Test volume
RPv
Pv
SF
V1
V2
PR
FC
Staubli RBE03
V3
S
J
TEST
Vp
Vr
T2 settling phase:
the pressure is recorded at the beginning of the phase (pressure P1);
• 
• P2);
the percentage ratio between pressures P1 and P2RVP%, corre-
sponds to the volumetric ratio between the total volume
volume) and the .
Represented By: GTEK AUTOMATION Lake Forest, CA 92630 Ph. 949-680-4242 www.gtek-automation.com

Related product manuals