EasyManua.ls Logo

TERSUS BCPI13 - 5. Installation of Pipes

Default Icon
59 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 14 -
deformation.
●Double-check that the support base is strong enough before fixing the unit.
The heat pump will produce condensation water: remember to provide a drainage channel when
making the installation base.
●Please install shock absorbers on the surface of the base.
Figure 5 Lifting diagram
5.1 Attention
● Prevent air, dust and other material from going into the water pipes.
● Fix the whole system before installing the water pipes.
● Water inlet and outlet pipes should be protected by an insulation layer.
5. Installation of pipes

Related product manuals