EasyManua.ls Logo

TERSUS BCPI13 - Installation of Optional Accessories

Default Icon
59 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 17 -
●The water quality should be analyzed before operating the unit: PH value, conductivity, Chloride ion
concentration and sulphate ion concentration should be checked.
●Acceptable water quality shown below:
PH value
Total hardness
Conductivity
Sulphate ion
Chlorine ion
Ammonia ion
78.5
< 50ppm
<200μV/cm(25)
None
< 50ppm
None
Sulfate ion
Silicon
Iron content
Sodium
Ca
< 50ppm
< 50ppm
< 0.3ppm
No requirement
< 50ppm
● Suggested filter mesh = 40.
6.1 Selection of the water pump
●The circulation pump is required for the system to operate, there is a terminal connection for the
pump (single phase)
NOTE
For single-phase pumps, please check the wiring diagram.
●Head of circulation pump = height difference between water level and main unit + total pipeline
resistance (determined by the hydraulic calculation) + pressure loss of main unit (see nameplate on
heat pump).
NOTE
Multiple units are installed in parallel place more demand on the water pump requirement.
6.2 Water pipe selection
●The selection of the water pipe should be based on the actual system specifications
●The flow switch can be installed horizontally or vertically. If installed the direction of the water flow
6. Installation of optional accessories

Related product manuals