EasyManua.ls Logo

TestEquity 1007H - Installation Location Guidelines

TestEquity 1007H
59 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 2 Installation
Page 2-2 TestEquity 1007H Temperature Chamber
Installation Location
The chamber will produce a significant amount of heat during normal operation. Locate the
chamber in a room with adequate ventilation to prevent excessive heat build-up. The chamber
generates a heat load of up to 12,000 btuh during a continuous cool down from a high
temperature.
The chamber must be on a solid and level floor. Allow enough space around the chamber to
permit serviceability and the removal of the service access panels, which are located on each side
and the rear.
! CAUTION: The minimum clearance you should allow for proper ventilation around the
chamber must be at least 12" from both the left and right side, and 24" from
the rear.
! CAUTION: This chamber is designed for operation in a conditioned laboratory
environment. Operation above 30°C (85°F) or below 16°C (60°F) ambient
room temperature is NOT recommended.

Table of Contents

Related product manuals