EasyManua.ls Logo

Textron Bell 412EP - Each 300 Hours or 6 Months of Expandable Blade Bolt Operation

Textron Bell 412EP
288 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BHT-412-MM-2
5-00-00
Export Classification C, ECCN EAR99
SPECIAL INSPECTIONS
5-22A. EACH 300 HOURS OR 6 MONTHS OF EXPANDABLE BLADE BOLT OPERATION
DATA REFERENCE INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
Accomplish each 300 hours or 6 months of main
rotor expandable blade bolt operation.
ASB 412-09-137 EXPANDABLE BLADE BOLT (412-010-137-103)
EXPANDABLE BOLT HANDLE SHALL NOT BE
CLOSED WHEN THE BOLT IS NOT INSTALLED
UNLESS THE TENSIONING NUT HAS BEEN
LOOSENED. FAILURE TO FOLLOW THIS
CAUTION COULD RESULT IN DAMAGING THE
BOLT RING SEGMENTS.
Chapter 62 1. Remove the main rotor expandable blade bolts (if installed)
from the main rotor hub assembly.
01 JUN 2018 Rev. 26 Page 132A

Table of Contents

Related product manuals