EasyManua.ls Logo

Textron Bell 412EP - 5-5. DAILY INSPECTION - PART A

Textron Bell 412EP
288 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BHT-412-MM-2
5-00-00
7 NOV 2016 Rev. 25 Page 9
Export Classification C, ECCN EAR99
SCHEDULED INSPECTIONS
5-5. DAILY INSPECTION — PART A
DATA REFERENCE INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
For helicopters on the Part A inspection program,
accomplish the following checks daily before flight
operation.
GENERAL
1. Each listed inspection item or maintenance function is to
be performed in accordance with the BHT-412-MM chapter
specified or the BHT-412-CR&O.
2. Refer to the applicable Pratt & Whitney Canada Engine
Maintenance Manual for engine inspection requirements.
PRELIMINARY REQUIREMENTS
Corrosion Control
Guide,
CSSD-PSE-87-001.
1. Use medium helicopter corrosion control guide to establish
helicopter corrosion control program.
Chapter 4 2. Replace all finite life components that have completed
published operating limitations.
Chapter 5 3. Overhaul all components that have completed published
overhaul periods.
Chapter 12 4. Lubricate and service helicopter as required.

Table of Contents

Related product manuals