EasyManua.ls Logo

Textron Bell 206L3 User Manual

Textron Bell 206L3
230 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
BHT-206L3-MM-1
NOTICE
The instructions set forth in this manual, as supplemented or modified by Alert Service Bulletins (ASB) or
other directions issued by Bell Helicopter Textron Inc. and Airworthiness Directives (AD) issued by the
applicable regulatory agencies, shall be strictly followed.
Maintenance Manual also applicable to 206L3+ helicopters (Increased Gross Weight kit 206-706-530
installed per BHT-206-SI-2052).
Export Classification C, ECCN EAR99
32672)),&(%2;)257:257+7(;$6
REISSUE — 27 AUGUST 1992
REVISION 24 — 25 JUNE 2019
COPYRIGHT NOTICE
COPYRIGHT
201
BELL
®
HELICOPTER TEXTRON INC.
AND BELL HELICOPTER TEXTRON
CANADA LTD.
ALL RIGHTS RESERVED
MAINTENANCE MANUAL
VOLUME 1
GENERAL INFORMATION

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Textron Bell 206L3 and is the answer not in the manual?

Textron Bell 206L3 Specifications

General IconGeneral
BrandTextron
ModelBell 206L3
CategoryToy
LanguageEnglish

Summary

MAINTENANCE MANUAL VOLUME 1

GENERAL INFORMATION

Provides an overview of the manual and general instructions.

CHAPTER 4 — AIRWORTHINESS LIMITATIONS SCHEDULE

AIRWORTHINESS LIMITATIONS SCHEDULE

Specifies the mandatory limits for components.

4-1. AIRWORTHINESS LIMITATIONS SCHEDULE

Table 4-1. Airworthiness Limitations Schedule

CHAPTER 5 — INSPECTIONS AND COMPONENT OVERHAUL SCHEDULE

INSPECTIONS

Covers various types of inspections for the helicopter.

SCHEDULED INSPECTIONS

Details the planned inspection programs.

5-7. SCHEDULED INSPECTIONS

5-8. AIRFRAME INSPECTION PROGRAM

Details airframe inspection programs.

5-9. AIRFRAME PROGRESSIVE INSPECTION PROGRAMS

Explains progressive inspection programs.

5-10. 100-HOUR AIRFRAME PROGRESSIVE INSPECTION PROGRAM

Details the 100-hour inspection program.

5-11. 300-HOUR AIRFRAME PROGRESSIVE INSPECTION PROGRAM

5-12. AIRFRAME PERIODIC INSPECTION PROGRAM

5-13. 100-HOUR AIRFRAME PERIODIC INSPECTION PROGRAM

5-14. 300-HOUR AIRFRAME PERIODIC INSPECTION PROGRAM

Table 5-3. 300-Hour Airframe Progressive or 300-Hour Airframe Periodic Inspection Program Prerequisites

PROGRESSIVE INSPECTIONS 5-16. 100-HOUR AIRFRAME PROGRESSIVE INSPECTION — EVENT NO. 1

ZONE 1 — MAIN ROTOR SYSTEM

Details inspections for the main rotor system.

MAIN ROTOR SYSTEM

Specific tasks for inspecting the main rotor system.

ZONE 2 — TAIL ROTOR ASSEMBLY

TAIL ROTOR ASSEMBLY

Specific tasks for inspecting the tail rotor assembly.

ZONE 3 — FORWARD DECK

AIRFRAME (FORWARD DECK)

Specific tasks for the forward deck airframe.

PROGRESSIVE INSPECTIONS 5-17. 100-HOUR AIRFRAME PROGRESSIVE INSPECTION — EVENT NO. 2

ZONE 4 — POWER PLANT

Details inspections for the power plant.

AIRFRAME (POWER PLANT AREA)

Specific tasks for the power plant airframe.

PROGRESSIVE INSPECTIONS 5-18. 100-HOUR AIRFRAME PROGRESSIVE INSPECTION — EVENT NO. 3

PROGRESSIVE INSPECTIONS 5-19. 100-HOUR AIRFRAME PROGRESSIVE INSPECTION — EVENT NO. 4

PROGRESSIVE INSPECTIONS 5-20. 100-HOUR AIRFRAME PERIODIC INSPECTION

SCHEDULED INSPECTIONS 5-28. 100-HOUR INSPECTION

SCHEDULED INSPECTIONS 5-29. 300-HOUR INSPECTION

SCHEDULED INSPECTIONS 5-30. 1000-HOUR INSPECTION

SCHEDULED INSPECTIONS 5-31. 1200-HOUR INSPECTION

SCHEDULED INSPECTIONS 5-32. AS REQUIRED BY MANUFACTURER

SCHEDULED INSPECTIONS 5-33. WEEKLY INSPECTION

MAIN ROTOR HUB AND BLADES, AND TAIL ROTOR HUB AND BLADES

Details inspections for main and tail rotor components.

SCHEDULED INSPECTIONS 5-34. 12-MONTH INSPECTION

SCHEDULED INSPECTIONS 5-35. 12 MONTHS OF COMPONENT OPERATION

SCHEDULED INSPECTIONS 5-36. 24-MONTH INSPECTION

SCHEDULED INSPECTIONS 5-37. 60-MONTH INSPECTION

SCHEDULED INSPECTIONS 5-38. 300-HOUR OR 12-MONTH INSPECTION

SCHEDULED INSPECTIONS 5-39. 600 HOURS OF COMPONENT OPERATION

SCHEDULED INSPECTIONS 5-40. 600 HOURS OR 12 MONTHS OF COMPONENT OPERATION

SCHEDULED INSPECTIONS 5-41. 1200 HOURS OF COMPONENT OPERATION

SCHEDULED INSPECTIONS 5-42. 1500 HOURS OF COMPONENT OPERATION

SCHEDULED INSPECTIONS 5-43. 1500 HOURS OF COMPONENT OPERATION AND EVERY 50 HOURS THEREAFTER

SCHEDULED INSPECTIONS 5-44. 2250 HOURS OR 60 MONTHS OF COMPONENT OPERATION

SCHEDULED INSPECTIONS 5-45. 3000 HOURS OF COMPONENT OPERATION

SPECIAL INSPECTIONS 5-46. SPECIAL INSPECTIONS

SPECIAL INSPECTIONS 5-47. AFTER FUEL SYSTEM MAINTENANCE AND/OR COMPONENT CHANGE

SPECIAL INSPECTIONS 5-48. 1 TO 5 HOURS AFTER EACH INSTALLATION

SPECIAL INSPECTIONS 5-49. 3 TO 8 HOURS AFTER EACH INSTALLATION

SPECIAL INSPECTIONS 5-50. 10 TO 25 HOURS AFTER EACH INSTALLATION

SPECIAL INSPECTIONS 5-51. 100 HOURS AFTER EACH INSTALLATION

CONDITIONAL INSPECTIONS 5-52. CONDITIONAL INSPECTIONS

CONDITIONAL INSPECTIONS 5-53. HARD LANDING

CONDITIONAL INSPECTIONS 5-54. SUDDEN STOPPAGE/ACCELERATION

CONDITIONAL INSPECTIONS 5-55. OVERSPEED MAIN ROTOR — 114% OR GREATER

CONDITIONAL INSPECTIONS 5-56. OVERTORQUE

CONDITIONAL INSPECTIONS 5-57. ENGINE COMPRESSOR STALL OR SURGE

PART III: INSPECTION FOR COMPRESSOR STALL OR SURGE WITH NOTICEABLE YAW

CONDITIONAL INSPECTIONS 5-58. LIGHTNING STRIKE

CONDITIONAL INSPECTIONS 5-59. ENGINE OVERTEMP

COMPONENT OVERHAUL SCHEDULE 5-60. COMPONENT OVERHAUL SCHEDULE

Table 5-4. Component Overhaul Schedule

Lists component overhaul intervals.

Table 5-4. Component Overhaul Schedule (Cont)

Related product manuals