BHT-206L3-MM-1
5-00-00
Export Classification C, ECCN EAR99
5-48. 1 TO 5 HOURS AFTER EACH INSTALLATION
DATA REFERENCE INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
DATE: __________________W.O. _____________________
FACILITY: __________________________________________
HELICOPTER S/N: ___________________________________
REGISTRY NO.: _____________________________________
TOTAL TIME:_______________________________________
SIGNATURE:________________________________________
MAIN ROTOR
Chapter 62 Torque check main rotor mast nut 250 to 275 foot-pounds
(339.0 to 372 Nm) until the torque is stabilized
(TB 206L-07-223).
10 MAR 2017 Rev. 23 Page 145/146