EasyManua.ls Logo

Thermo King T-1080S User Manual

Thermo King T-1080S
70 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Installation Manual
Ingersoll Rand’s Climate Solutions sector delivers energy-efcient HVACR solutions for
customers globally. Its world class brands include Thermo King, the leader in transport
temperature control and Trane, a provider of energy efcient heating, ventilating and air
conditioning systems, building and contracting services, parts support and advanced controls
for commercial buildings and homes.
©2011 Ingersoll-Rand Company
Printed in U.S.A. on Recycled Paper
Truck Edition (TSA, EMEIA and AP)
Single Temperature Systems
T-580R, T-800M and T-1000M (with TSR Controller)
T-680S, T-880S, T-1080S (with SR-3 Controller)
T-600R, T-680R, T-800R, T-880R, T-1000R & T-1080R (with SR-3 Controller)
T-1200R (EMEIA Only with SR-3 Controller)
TK 55212-1-IM (Rev. 4, 01/15)
Question and Answer IconNeed help?

Do you have a question about the Thermo King T-1080S and is the answer not in the manual?

Thermo King T-1080S Specifications

General IconGeneral
BrandThermo King
ModelT-1080S
CategoryAir Conditioner
LanguageEnglish

Summary

Safety Precautions

Safety Symbols and General Warnings

Explains safety symbols and critical operational warnings.

Battery Installation and Cable Routing

Provides guidelines for safe battery installation and cable management.

Refrigerant and Oil Handling Safety

Details safety procedures for handling refrigerants and refrigeration oil.

Unit and Service Area Dimensions

Lifting Bar Details

Uncrating the Unit

Installing the Unit

Installing the Fuel Pickup Tube Into a Steel or Aluminum Tank

Installing the Fuel Pickup Tube Into a Plastic Tank

Installing the Steel Fuel Tank

Installing the Aluminum Fuel Tank (OPTION)

Installing the Fuel Pump and Fuel Lines

Installing the ServiceWatch™ Remote Download Port (OPTION)

Installing the Remote Power Receptacle (OPTION)

Installing the Remote Status Light (OPTION)

Installing the Battery Box (OPTION)

Battery Connections

Positive Cable Connection

Guides the connection of the positive battery cable and unit power wire.

Installing the Door Switch (OPTION)

Auxiliary Electrical Accessories

UNIT CHECK LIST

General Unit Pre-Checks

Lists essential checks before starting the unit for the first time.

Multi-Temp Unit Checks

Specific checks for multi-temperature refrigeration systems.

Start and Run Unit Checks

Procedures for running the unit and verifying its operation.

Related product manuals