EasyManua.ls Logo

Tinius Olsen L Series - User Manual

Tinius Olsen L Series
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...


Unit 6 Perrywood Business Park, Honeycrock Lane, Salfords, Surrey, RH1 5DZ, England, UK
Telephone: +44 1737 765001 Facsimile: +44 1737 764768 Website: www.tiniusolsen.com
L-Series Tensile Test Machines
Instructions For Use
Issue 01
Question and Answer IconNeed help?

Do you have a question about the Tinius Olsen L Series and is the answer not in the manual?

Summary

Introduction to L-Series Test Machines

L-Series Machine Technical Specifications

Load Frame and Construction Details

Details on load frame capacity, style, construction, and dimensions.

Control Panel and Measurement Systems

Specifications for the control panel, force, and extension measurement.

L-Series Machine Specs - Speed, Options, Environment

Speed Control and Hardware Options

Parameters for speed control and available hardware options.

Environmental, Power, and Compliance Specifications

Details on temperature, humidity, power requirements, CE mark, and manufacturer.

Machine Unpacking Procedures

Unpacking H1 KL and H5 KL Models

Step-by-step guide for unpacking H1KL and H5KL machine models.

Unpacking Higher Capacity Models (H10 KL-H50 KL)

Procedure for unpacking higher capacity models, including case and constraint removal.

Checking Shipped Contents

Load Cell and Nose Piece Verification

Verification of load cell, nose piece attachments, and grip pins.

Power Transformer and PC Connection Lead Check

Ensuring the power transformer and RS232 serial lead are present.

Machine Installation and Power Connection

Location Selection and Mains Supply Connection

Guidelines for choosing installation location and connecting mains supply.

Warning Symbols and Power Transformer Connection

Understanding warning symbols and connecting the power transformer.

Load Cell Fitting and PC Connectivity

Fitting Load Cells to Machine Crossheads

Step-by-step guide for fitting load cells to single and twin screw machines.

Connecting the Testing Machine to a PC

Procedure for connecting the machine to a PC using the RS-232 serial cable.

Power ON Checks and System Initialization

Emergency Stop and Power Switch Operation

Verifying the emergency stop and power ON/OFF switches' functionality.

Mechanical Limit Switches and Crosshead Control

Setting limit switches and operating crosshead control keys for safe movement.

Understanding Machine Alarms

Crosshead Limit and Load Limit Alarms

Indicators and clearing procedures for crosshead and load limit alarms.

Emergency Stop and Motor Drive Alarms

Managing emergency stop and motor drive related alarms and their indicators.

Auxiliary Equipment and Tooling Installation

Connecting Auxiliary Equipment Ports

Information on connecting external equipment via the auxiliary port.

Tooling Attachment Parts and Installation Method

Details on tooling attachment parts and the step-by-step installation method.

Ensuring Proper Tooling Alignment

Crucial steps for aligning tooling to obtain realistic measurement results.

Operator Safety and Routine Maintenance

General Safety Guidelines and Precautions

Essential safety rules, protective clothing, and hazard avoidance.

Routine Maintenance for Electrical and Calibration

Maintenance of electronics, protection fuses, and load cell calibration.

Lubrication and Machine Storage Procedures

Recommendations for lubricating machine parts and long-term storage.

Tinius Olsen L Series Specifications

General IconGeneral
BrandTinius Olsen
ModelL Series
CategoryTest Equipment
LanguageEnglish

Related product manuals