EasyManua.ls Logo

Tokheim Quantium 110 User Manual

Tokheim Quantium 110
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Quantium
110 & 210
Installation Manual
Document Ref 947571-001
Rev - 2
03/2011

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Tokheim Quantium 110 and is the answer not in the manual?

Tokheim Quantium 110 Specifications

General IconGeneral
ManufacturerTokheim
ModelQuantium 110
Display TypeLCD
CategoryDispenser
FuelsGasoline, Diesel, Ethanol
Hose ConfigurationSingle or Double
Nozzle CapacityStandard Nozzle
Payment OptionsCash
ConnectivityEthernet

Summary

Introduction

Health and Safety

Outlines essential health, safety, and accident prevention measures for installation.

Safety Checklist

Mandatory safety checks to be performed during all work activities.

Hazards

Identifies potential hazards during installation and necessary precautions.

Warning Signs

Lists standard warning signs found on dispensers and their meanings.

Personal Protective Equipment (PPE)

Specifies required protective clothing and safety equipment for hazardous areas.

Site Preparation

Zoning Diagrams

Illustrates hazardous area classifications (Zone 1 and Zone 2) for dispenser placement.

Hydraulic Connections

Details various hydraulic connection types and methods for dispensers.

Technical Drawings

Packaging and Handling

Installation Procedures

Lifting Procedures

Guidelines and warnings for safely lifting and positioning dispensers.

Placement on Island

Pre-placement checks and procedures before positioning the dispenser.

Fixing to Ground

Details methods for securely anchoring the dispenser to the ground.

Earthing Requirements

Essential guidelines and recommendations for proper dispenser earthing.

Hydraulic Connections

Detailed instructions for making various hydraulic pipework connections.

Suction Dispensers with Internal Filter

Specific pipework for suction dispensers with internal filters.

Suction Dispensers with External Filter

Specific pipework for suction dispensers with external filters.

Submerged Dispensers Pipework

Instructions for pipework connections for submerged dispenser systems.

Electrical Connections

Guidance on making safe and compliant electrical connections.

Direct Wiring into Terminal Rail

Steps for direct electrical wiring to the WWC terminal rail.

Commissioning Procedures

Test and Programming Dispenser

Steps for testing and programming the dispenser before handover.

Calibration of Dispenser

Procedures for calibrating meters and electronic components.

Mechanical Meter Calibration

Steps for performing manual calibration of the dispenser meter.

Electronic Pulser Calibration

Guide to calibrating the MPE pulser electronically using UAK.

Final Checks

Final verification of W&M compliance, readings, and serial numbers.

Related product manuals