EasyManua.ls Logo

Tokheim Quantium 110 - General Installation Notes

Tokheim Quantium 110
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 5-2 Document Ref 947571-001 Rev 2
Installation Quantium 110 & 210 Installation Manual
5 INSTALLATION
5.1 General
Before the dispenser can be installed, the Safety Instructions as described in Section 1.5
and the Installation Instructions in this section must be carefully read.
Follow unpacking instructions in Section 4.2.1.
After unwrapping and before installation, the dispensers must be checked for any faults or
damage. Any faults or damage found must be reported to the Installation Supervisor
immediately.
NOTE: IF USING SUBMERGED PUMPS, THE CONTROL MUST BE
COMPLETELY ISOLATED DURING ALL PHASES OF INSTALLATION.
The following checks need to be made before starting the installation :-
Check that the electric cabling and the piping arrangements have been made in accordance
with the Installation drawings in section 3.
Check that the leakage plates have been produced in accordance with the Installation
drawing. Any differences or defects should be reported to the Installation Supervisor
immediately. The function of the leakage plate is to drain leakages to the outside of the
dispenser where they act as a warning to the station attendant.
Check that all flame arresters are correctly installed according to the drawings.
5.2 Identification of Side A
The different sides of the dispenser referred to in this manual are described as follows:-
Side A of the dispenser has the pulleys and inlet connections (visible upon removal of
hydraulic doors). All single hose models have the hose on the right hand side when facing
side A.
Side A

Table of Contents

Related product manuals