EasyManua.ls Logo

Topdon BT50 - 3. Charging Test: Preparation and Steps; 3.1 Before Conducting Test; 3.2 Performing the Test

Topdon BT50
102 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. CHARGING TEST
3.1 BEFORE TEST
The engine must be ON during test.
3.2 STEPS
1) Press the "OK" button to display the main menu. Then
select "3. Charging Test" and press the "OK" button to
conrm.
2) Start your engine, then press the "OK" button to conduct
a "Ripple Test". The interface will stay for 5 seconds and then
automatically jump to next page.
3) Follow the on-screen instructions to increase your engine
speed to 2500 r/min and hold for 5 seconds. Then press the
"OK" button and wait a few seconds for the test result.
6. About
Please start engine,
Press OK to
continue.

Related product manuals