Note:Determinetheleftandrightsidesofthe
machinefromthenormaloperatingposition.
1
InspectingtheVerticutter
Partsneededforthisprocedure:
1Verticutter
Procedure
Aftertheverticutterisremovedfromthebox,inspect
thefollowing:
1.Checkeachendofthereelforgrease.Grease
shouldbevisiblyevidentinthereelbearingsand
intheinternalsplinesofthereelshaft.
2.Ensurethatallhardwareissecurelytightened.
3.Makesurethatthecarrierframesuspension
operatesfreelyanddoesnotbindwhenmoved
backandforth.
2
InstallingtheTransport
Rollers
Partsneededforthisprocedure:
2Transportrollerassembly
2
Cotterpin
Procedure
Secureatransportrollerbrackettoeachsideplatepin
withacotterpin(Figure3).
g313795
Figure3
1.Cotterpin
2.Transportrollerassembly
Note:Therollershouldbepositionedtotherearof
theverticutter.
6