EasyManua.ls Logo

Toro 04383 Greensmaster 3250-D - Ensuring Uniform Cutting Unit Height

Toro 04383 Greensmaster 3250-D
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
19
3. On cutting units equipped with a offset lift hook
(Fig. 22, inset) verify that the distance from the top of
the carrier frame adjusting screw to the back of the
carrier frame is 1 inch (25 mm). If the distance is not 1
inch (22 mm), proceed to step 4.
Right Front Shown
1 in.
(25 mm)
1
2
3
4
Figure 22
1. Transport plate
2. Adjusting screw
3. Transport plate mounting
screw
4. Offset lift hook
4. Loosen the transport plate mounting screws
(Fig. 20–22).
5. Raise the cutting units to the transport position.
Important Do not raise the suspension to the transport
position when the reel motors are in the holders in the
traction unit frame. Damage to the motors or hoses could
result.
6. Ensure each carrier frame is at the same height from the
ground. If they are, proceed to step 8.
7. If the carrier frames are not at the same height, loosen
the jam nut on the carrier frame adjusting screw
(Fig. 20–22). Rotate the screw outward to raise and
inward to lower. Tighten the jam nut after the proper
height is obtained.
8. Rotate the transport plate until it locks the pull frame.
Tighten the screws.

Table of Contents

Related product manuals