EasyManua.ls Logo

Toro ProLine 30177 - Set-Up; Loose Parts

Toro ProLine 30177
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
Set-Up
Loose
Parts
Note: Use the chart below to verify all parts have been shipped.
DESCRIPTION QTY. USE
Upper handle
Flanged bolt 3/8–16 x 1” (26 mm)
Flange nut 3/8–16
1
4
4
Install upper handle to frame
Shift lever
Shift lever mounting bracket
W
asher 1/4”
Bolt 1/4–28 x 2” (51 mm)
1
1
1
1
Install shift lever to transmission
Rod fitting
Clevis pin
W
asher 1/4”
Hairpin cotter
2
2
2
2
Install control rods
Fuel tank
Control panel
Bolt 5/16–1/ x 7/8” (22.5 mm)
Lock washer 5/16”
W
asher 5/16”
Hose clamp
1
1
4
4
4
2
Install fuel tank and control panel
Screw self-tapping
Star washer
Wire tie
1
1
1
Install wire harness to frame
Operator
s Manual
Engine Operator
s Manual
Parts Catalog
Registration card
1
1
1
1
Read before operating machine
Fill out and return to T
oro

Related product manuals