EasyManua.ls Logo

Toro Titan Z4800 - Page 118

Toro Titan Z4800
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGINE
6-72007 - 2008 Titan Z Service Manual
6
7. Install the blue wire to the oil sending sensor located
QH[WWRWKHRLO¿OWHU)LJ
4. Position the 2 ground wires onto the engine ground
base. Install a nut to secure the 2 ground wires (Fig.
329).
6. Plug the yellow/white wire plug to the grey/black
(fuel solenoid and the engine magneto) wire plug
(Fig. 331).
Fig. 329 IMG-0395a
5. Position the heavy red wire onto the starter terminal.
Install a nut to secure the heavy red wire to the
starter terminal (Fig. 330).
Fig. 330 IMG-0394a
Fig. 331 IMG-0258
Fig. 332 IMG-0264a

Other manuals for Toro Titan Z4800

Related product manuals