EasyManua.ls Logo

Toshiba BMS-SM1280ETLE - Operation Checks

Toshiba BMS-SM1280ETLE
54 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
30
12-2.Operation check
Complete the test run of air conditioners before operation check.
No. Item Details Procedure
1 Start-up check Turn on the all air conditioners.
Turn on the all interfaces.
Turn on Smart Manager with data analyzer and
check that the LCD displays all the air
conditioners where the intensive management
addresses are set.
Check that the interfaces LEDs properly illuminate
or blink.
For further details, refer to the Installation
manual of each device.
Energy Monitoring Relay
I/F
LED1 (Red) illuminates
LED2 (Green) blinking
Digital Input / Output
Relay I/F
LED1 (Red) illuminates
LED2 (Green) blinking
2 Check for electric
energy meter input
Check for electric energy meter pulse input
3 Check for fire alarm
input
Check for fire alarm signals input; Check for electric
lock signals input
4 Logon From the client PC browser, access Smart Manager
with data analyzer to display the logon screen.
For further details, refer to the Network
Configuration Guide of Smart Manager with
data analyzer.
In the logon screen, enter a user name and a
password to log on.
Factory default: user name (TCC), password (TCC)
(*) Logon in not available immediately after the start-
up. Wait for approx. 5 minutes and enter the
information to log on.
For further details, refer to the Owner’s
manual of the Smart Manager with data
analyzer.
5 Check at the time of
air conditioner
setting change
Start or stop the air conditioner from the client PC to
check that the air conditioner operates accordingly.
6 Check air conditioner
status display
Change the operation status or setting status using
the air conditioner remote controller to check that
the client PC monitor screen properly displays the
status.

Related product manuals