EasyManua.ls Logo

Toshiba RAS-18SAV2-E1 - Installation Procedure

Toshiba RAS-18SAV2-E1
103 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
47
10. INSTALLATION PROCEDURE
10-1. Installation Diagram of Indoor and Outdoor Units
FILE NO. SVM-11031
A
C
L
Rear
left
Wall
For the rear left and left piping
8 mm thick heat resistin
g
polyethylene foam
Insulate the refrigerant pipes separately
with insulation, not together.
Right
Left
Rear right
The auxiliary piping can be connected
to the left, rear left, rear right, right,
bottom right or bottom left.
Make sure to run the drain hose
sloped downward.
Insert the cushion between the indoor
unit and wall, and tilt the indoor unit for
better operation.
Cut the
piping hole
sloped slightly.
Bottom right Bottom left
Do not allow the drain hose to get slack.
• Loading Batteries
1. Remove the battery cover.
2. Insert 2 new batteries (AAA type)
following the (+) and (–) positions.
Before installing the wireless remote controller
3 Batteries
2 Wireless remote controller
Shield pipe
(
A
t
t
a
c
h
t
o
t
h
e
f
r
o
n
t
p
a
n
e
l
.
)
3 Batteries
5
6
2 Wireless remote control
TOSHIBA New IAQ filter
TOSHIBA New IAQ filter
Hook
170 mm or more
50 mm or more
170 mm or more
1 Installation
plate
Hook
600
mm or more
S
addl
e
100 mm or more
100 mm or more
600 mm or more
600 mm or more
Ext
e
n
s
ion
d
r
a
in ho
se
(Not available, provided b
y
installer
)
Vin
y
l tape
Apply after carryin
g
out a draina
g
e test
.
4 R
e
mot
e
c
ontroll
e
r
holder
8
woo
d
sc
r
ew
Pan head

Table of Contents

Related product manuals