EasyManua.ls Logo

Toshiba RBC-AMS54E - For First Use; Note

Toshiba RBC-AMS54E
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
–9–
Installation Manual
For first use
It takes some time before the remote controller becomes operable when the remote controller is used for the first
time. This is not a malfunction.
<When the power is turned on for the first time after installation>
It takes about 5 minutes before the remote controller becomes operable.
<When the power is turned on from the second time>
It takes about 1 minute before the remote controller becomes operable.
Note
For the operation of switching the room temperature sensor or the settings of the test operation, refer to the page
20.

Other manuals for Toshiba RBC-AMS54E

Related product manuals