4
ENGLISH
Screw
Washer
Nut
Wax seal
INSTALLATION PROCEDURE
1. Open the Unifit Rough-In packaging.
Follow the Unifit Rough-In
Installation instruction to complete
the rough-in installation (ill. 1).
2. Place the template into position and
follow its instructions to prepare for
installing the toilet.
Do not move the Unifit Rough-
In on the Floor Flange after
wax seal is set. If this notice is
disregarded, discard the wax ring
and replace with new wax ring.
NOTICE
3. Place the toilet over the Unifit Rough-
In and the two mounting blocks, by
aligning the toilet outlet with the Unifit
Rough-In opening (ill. 2).
Insert the toilet all the way
into position. If this notice is
disregarded, leakage may result.
NOTICE
ill.1
Mounting block
Unit
ill.2
ill. 3
4. Align the toilet perpendicular to the
back wall and parallel to side walls;
it should not sit crooked or diagonal
(ill. 3).