Tr
acVan installation is straightforward, and should take you
un
der 20 minutes to complete. You’ll attach the Crossbars to
th
e Corner Brackets, then attach this assembly to the Gutter
1. V
erify that you have received the correct parts using the
at
tached Assembly Drawing and Packing Checklist.
TRACVAN
INST
ALLATION INSTRUCTIONS
SKU# 29054, 29055 & 29056
Special Installation notes:
• A
ll 1998+ Chevy Express / GMC Savanna (G-Series Vans) require the supplied Gutter
Sp
an, which are designed to span the putty filled rain gutter of the Van for maximum
st
rength. If you use the supplied Gutter Spans, refer to “Roof Installation B” instruc-
ti
ons on page 5 for proper installation.
• A
ll 2000+ Ford Econoline Vans: DO NOT install the rubber strips to the Corner Brackets.
• W
hen installing a TracVan Triple
to a C
hevy Express / GMC Savanna
(S
KU# 29056)
to a Chevy Express / GMC Savanna to a Chevy Express / GMC Savanna (S
KU# 29056)
(G
-Series Vans) and Ford Vans with curved roofs you’ll need to add the supplied Shims,
to co
mpensate for the gutter’s curve.