EasyManua.ls Logo

Trailer Valet MV PRO - Assembly; Operating Instructions

Default Icon
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATING INSTRUCTIONS
8
TESTING THE ASSEMBLY
Always ensure the operator and bystanders are aware of load stability.
1) Lower the trailer gradually until the existing jack is above the ground and the trailer is
completely supported by the MV Pro.
NOTE: Keeping the trailer jack close to the ground prevents serious damages from occurring
due to unexpected failures.
ATTACHING DRIVER
Option 1: Manual Operation with the Hand Crank.
1) Attach the Hand Crank to the Low or High Gear Driveshaft.
Option 2: Using the Drill Adapter.
1) Using the chuck of your drill/driver, connect to the Drill Adapter.
2) Secure the chuck of your drill around the Drill Adapter tightly to avoid the Adapter
slipping o the drill.
3) Align and insert the Drill Adapter to the Low Gear Driveshaft.
NOTE: If you are using a drill, be sure your battery pack is fully charged before use. Follow your
drill/driver manufacturer’s recommendation.
DO NOT use your drill on the high gear.
DO NOT use impact drills.
Knowing the proper techniques to operate your MV Pro can help keep you and others around
you safe. In this guide, you are shown the basic fundamentals for eective operation. However,
it is up to you to analyze the situation and make the decisions necessary for the proper use
of your MV Pro. Apply your knowledge of your MV Pro and the basic fundamentals you have
practiced to adjust your techniques to each unique situation. Safety is key, and always be
mindful of what you are doing as improper use can cause harm.

Related product manuals