EasyManua.ls Logo

TrailMaster cheetah i6 - Initial Settings; Roll Bar Installation Procedure

TrailMaster cheetah i6
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
• Do not let your child try to ride if he/she is not ready for it.
• You have to accompany your child when he/she is riding.
• Proper repair and maintenance are the key factors of safety ride.
Caution:
Bike performance would be affected if components which are not produced by
us are adapted or added on the bike. It is strongly recommended not to
remove original equipment or change the design and / or operation of vehicle.
Initial settings
This kart is shipped with the roll bar unattached. To attach the roll bar follow
these steps:
1 Attach the Left /Right side guards with
M8X50 bolts , R Washer and M8 Lock Nuts .
2 Attach the roof guards with M8X50 bolts , R
Washer and M8Lock Nuts .
3 Tighten all these bolts until the brush guard is
completely assembled. Torque should be in 22-
29N.m
The anti-roll bar has to be
installed, which will affect the safety of rider.