EasyManua.ls Logo

Trane Technologies 4TWA4036A3000A User Manual

Trane Technologies 4TWA4036A3000A
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SSAAFFEETTYY WWAARRNNIINNGG
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning
equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person
could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that
are attached to the equipment.
May 2020
1188--BBCC9977DD11--11DD--EENN
Split System Heat Pump
3-Phase, 230V
3-Phase, 460V
220088--223300VV MMOODDEELL
4TWA4036A3000A
4TWA4042A3000A
4TWA4048A3000A
4TWA4060A3000A
446600VV MMOODDEELL
4TWA4036A4000A
4TWA4042A4000A
4TWA4048A4000A
4TWA4060A4000A
NNoottee:: “Graphics in this document are for representation
only. Actual model may differ in appearance.”
Installer’s Guide
Question and Answer IconNeed help?

Do you have a question about the Trane Technologies 4TWA4036A3000A and is the answer not in the manual?

Trane Technologies 4TWA4036A3000A Specifications

General IconGeneral
BrandTrane Technologies
Model4TWA4036A3000A
CategoryHeat Pump
LanguageEnglish

Summary

Safety Warnings and Precautions

Hazardous Voltage Warning

Warning about electrical hazards and the need for lockout/tagout procedures.

Refrigerant Oil Handling

Caution regarding R-410A refrigerant pressure and POE oil hygroscopic properties.

Hot Surface Caution

Warning that surfaces may be hot, specifically mentioning the compressor top.

Refrigerant Pressure Warning

Caution regarding refrigerant under high pressure and the need to recover it.

Grounding Requirements

Warning on the importance of proper grounding and reconnection of devices.

Service Valve Operation Caution

Warning about extreme caution needed when opening service valves to prevent charge release.

Brazing and Leak Test Requirement

Warning about brazing joints and ensuring leak tests are negative for connections.

Chemical Exposure Warning (P65)

Product may expose you to chemicals like lead, known to cause cancer/birth defects.

Unit Location and Dimensions

Unit Dimensions and Weight Specifications

Table detailing unit dimensions (H x D x W) and weight in pounds.

Refrigerant Line Connection Sizes

Information on maximum total refrigerant line length and vertical change for units.

Unit Preparation and Setup

Damage Inspection and Reporting

Procedure for checking the unit for damage upon arrival and reporting it promptly.

Pallet Removal Instructions

Step-by-step guide on how to safely remove the unit from its shipping pallet.

Support Pad Installation Guidelines

Guidelines for selecting and installing a proper support pad for the outdoor unit.

Refrigerant Line Installation

Line Sizes and Valve Connections

Table specifying vapor/liquid line sizes and service valve connection sizes.

Factory Refrigerant Charge

Explanation of factory charge and the importance of verifying system charge.

Refrigerant Line Length and Lift

Guidance on determining required line length and vertical lift for charging calculations.

Refrigerant Line Insulation and Routing

Refrigerant Line Insulation

Instructions for insulating refrigerant lines, emphasizing the vapor line.

Reusing Existing Refrigerant Lines

Precautions and requirements for reusing existing refrigerant lines during retrofits.

Refrigerant Line Routing Precautions

Guidelines for routing lines to prevent noise and ensure proper support and isolation.

Refrigerant Line Brazing Procedures

Braze Refrigerant Lines to Service Valves

Step-by-step instructions for preparing and brazing refrigerant lines to service valves.

Refrigerant Line Leak Check and Evacuation

Refrigerant Line Leak Check

Procedure for checking refrigerant lines and evaporator coil for leaks using nitrogen.

Refrigerant Line Evacuation

Steps for evacuating the refrigeration system to a specified micron level.

Service Valve Operation

Open Gas Service Valve

Procedure for opening the gas service valve after leak check and evacuation.

Open Liquid Service Valve

Procedure for safely opening the liquid service valve with necessary caution.

Low Voltage Electrical Connections

Low Voltage Wire Length Limits

Table specifying maximum low voltage wire lengths based on wire gauge size.

Low Voltage Hook-up Diagrams

Wiring diagrams illustrating connections for thermostat, air handler, and outdoor unit.

Low Voltage Control System

Defrost Control Operation and Checkout

Information on the defrost control, its pins, and checkout procedures.

High Voltage Electrical Connections

High Voltage Power Supply Safety

Warnings and guidelines for connecting high voltage power to the unit safely.

High Voltage Disconnect Switch

Instructions for installing a disconnect switch and avoiding GFCI circuits.

System Start-Up Procedures

Initial Thermostat and Power Setup

Procedure for setting the thermostat to OFF and applying electrical power.

Crankcase Heater Delay Requirement

Requirement to wait one hour if crankcase heater is used and ambient is below 70°F.

System Charge Adjustment

Temperature Measurements for Charging

Guidance on measuring outdoor and indoor temperatures for accurate charging.

Subcooling Charging Corrections

Worksheet and instructions for calculating subcooling corrections based on line length and lift.

Subcooling Charging in Cooling Mode

Recommended Charging Method

Explanation of subcooling as the recommended charging method for specific temperatures.

System Stabilization Period

Procedure for waiting 20 minutes for system stabilization before measurements.

Charge Measurement and Adjustment

Steps for measuring liquid line temp/pressure and adjusting refrigerant charge.

Subcool Charging Correction Charts

Correction Charts for Line Length and Rise

Graphical tables to determine subcooling adjustments based on line length and lift.

Unit Charging and Performance Verification

Achieving Proper Gage Pressure

Using charging charts to attain proper liquid line gage pressure.

System Stabilization and Gauge Removal

Procedure for stabilizing the system after adjustments and removing gauges.

Performance Verification

Referencing system pressure curves in Service Facts for performance verification.

System Information Recording

Recording key system pressures and temperatures after charging is complete.

R-410A Refrigerant Charging Data

Liquid Temperature vs. Gage Pressure Chart

Table providing liquid gage pressure based on liquid temperature and design subcooling.

Installation Checkout Procedures

Final Installation Checklist

A comprehensive checklist of items to verify before completing installation.

Related product manuals