SSAAFFEETTYY WWAARRNNIINNGG
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning
equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person
could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that
are attached to the equipment.
March 2022 1188--EEBB3399DD11--11AA--EENN
Single Packaged Cooling/Electric Heat
13.4 SEER2 Convertible, 2 5 Ton
4TCC4024E1000A
4TCC4030E1000A
4TCC4036E1000A
4TCC4042E1000A
4TCC4048E1000A
4TCC4060E1000A
NNoottee:: “Graphics in this document are for representation only. Actual
model may differ in appearance.”
NNoottee:: “Unit specific Service Facts available online.”
Installation and Operations Manual
Question and Answer IconNeed help?

Do you have a question about the Trane Technologies 4TCC4060E1000A and is the answer not in the manual?

Trane Technologies 4TCC4060E1000A Specifications

General IconGeneral
SEER16
StagesSingle Stage
Sound Level74 dB
RefrigerantR-410A
Heating Capacity60, 000 BTU/h
SEER Rating16
Voltage208/230 V
Phase1
Sound Level (Outdoor Unit)74 dB
Cooling Capacity5 Tons (60, 000 BTU/h)

Summary

SAFETY SECTION

Charging in Cooling above 55°F OD Ambient

Determine Unit Clearances

Lifting and Rigging

Rooftop Installation - Frame Mounting

Rooftop Installation - No Curb/Frame

Procedure for rooftop installation using sleeper rails instead of a curb or frame.

Ductwork Installation

Condensate Drain Piping

Requirements for installing the condensate drain connection, including trap and pitch.

Electrical Wiring

Electrical Connections

Guidelines for making electrical connections according to local and national codes.

Power Wiring

Procedures for running power supply lines and making connections to the unit.

Control Wiring (Class II)

Unit Startup

Pre-Start Quick Checklist

A checklist of essential items to verify before starting the unit.

Starting the Unit in Cooling Mode

Procedure for starting the unit for cooling operation.

Operating Pressure Checks

Guidance on checking operating pressures after the unit has run for a short period.

Voltage Check

Instructions for checking line voltage at the unit during operation.

Starting the Unit in Heating Mode

Procedure for starting the unit for heating operation.

Sequence of Operation

Maintenance

Service Maintenance

Recommended annual checks by a qualified service technician.

Refrigerant Circuits

Troubleshooting Chart

Related product manuals