EasyManua.ls Logo

Trane Technologies CVHE - Forms; Instructions to the Chiller Operator.

Default Icon
95 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
After the unit has the system down to design leaving chilled water temp and is under control, and the
purge is no longer relieving non-condensables, begin taking the start-up test log. Log the unit a minimum
of 3 times at 15-minute intervals.
In the AdaptiView Purge Settings menu of the control panel, return the purge-operating mode to ‘Adaptive.
Restart the chiller and carefully observed the starting and loading sequence.
3. Instructions to the Chiller Operator.
Instructions for starting, operating, and shutting down.
Instructions for logging the unit.
Instructions for periodic maintenance.
D.
After 2 weeks of operation (International Units Only)
1. Remove the water box covers on both the evaporator and condenser. Mechanically brush clean all the
tubes. This is to assure there is no debris blocking any of the tubes. A piece of debris partially blocking a tube
may cause that tube to fail prematurely.
2. Replace the oil filter with the spare oil filter included in the control panel at time of shipment.
E.
Comments and/or Recommendations:
Service Technician Signature Date
82 TCVHE-SVX04D-EN
Forms
RELEASED 10/Mar/2020 06:59:20 GMT

Table of Contents

Related product manuals