EasyManua.ls Logo

Trane 4TTL5042N1000A User Manual

Trane 4TTL5042N1000A
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SSAAFFEETTYY WWAARRNNIINNGG
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning
equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person
could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that
are attached to the equipment.
June 2022
1188--AACC112266DD11--11AA--EENN
Side Discharge AC Models
For coastal applications where units are installed within one (1) mile of salt water, epoxy coated models are recommended. These models
have an 8 week lead time after order.
EEppooxxyy CCooaatteedd MMooddeell
4TTL5024N1000A
4TTL5030N1000A
4TTL5036N1000A
4TTL5042N1000A
4TTL5048N1000A
4TTL5024N1COTA
4TTL5030N1COTA
4TTL5036N1COTA
4TTL5042N1COTA
4TTL5048N1COTA
NNoottee:: “Graphics in this document are for representation
only. Actual model may differ in appearance.”
Installation and Operation Manual
Question and Answer IconNeed help?

Do you have a question about the Trane 4TTL5042N1000A and is the answer not in the manual?

Trane 4TTL5042N1000A Specifications

General IconGeneral
Model4TTL5042N1000A
RefrigerantR-410A
Voltage208/230V
Phase1
Frequency60 Hz
TypeSplit System
Cooling Capacity42, 000 BTU/H
Compressor TypeClimatuff® Scroll

Summary

Side Discharge AC Models

Safety Warning

Critical safety precautions before installation and servicing.

Safety Section

Hazardous Voltage

Precautions for high voltage electrical hazards.

Refrigerant Handling

Safe handling procedures for refrigerants and oils.

Hot Surface Warning

Caution regarding hot surfaces on the unit.

Refrigerant Containment

Warnings about refrigerant under pressure.

Grounding Requirements

Importance of proper electrical grounding.

Service Valve Operation

Safe operation of refrigerant service valves.

Brazing and Leak Testing

Procedures for brazing and leak testing connections.

Unit Location Considerations

Refrigerant Line Leak Check

Procedures for checking refrigerant lines for leaks.

System Start Up

Subcooling Charging in Cooling

System Charge Adjustment

Refrigerant Charging Chart

Subcool Charging Charts

Charging the Unit

Checkout Procedures

Related product manuals