Installation
Operation
Maintenance
Cooling only: CGAN 200 - 250 - 300 -
400 - 450 - 490 - 500 - 600 - 700 - 800 -
900 - 925
Reversible: CXAN 200 - 250 - 300 - 400
- 450 - 490 - 500 - 600 - 700 - 800 - 900
- 925
CG-SVX01C-E4
Question and Answer IconNeed help?

Do you have a question about the Trane AquaStream2 CXAN 450 and is the answer not in the manual?

Trane AquaStream2 CXAN 450 Specifications

General IconGeneral
BrandTrane
ModelAquaStream2 CXAN 450
CategoryChiller
LanguageEnglish

Summary

General Information

Warnings and Cautions

Safety alerts and warnings for user protection during operation.

Safety Recommendations

Guidelines and advice for safe operation and maintenance practices.

Installation

Water Circuit Safety Warning

Safety advisory regarding water circuit pressure and handling.

Electrical Connections Guidance

Guidance on wiring the unit safely and correctly.

Expansion Valves Settings

Procedure for setting expansion valves during commissioning.

General Start-up

Start Up Preparation Checklist

Checklist of pre-operation checks before unit startup.

Installation and Chiller Inspection

Verifying unit installation, condition, and safety features.

Compressor Checking and Setting

Procedures for checking compressor oil, windings, and rotation.

Electrical Wiring Checks

Verifying power supply, control wiring, and overload settings.

Condenser and Operating Parameters

Inspecting condenser and monitoring operational data post-start.

Final Start-up Checks

Performing final inspections after the unit is running.

Operation

Control System Overview

Overview of the TRACER CH532 control module.

Unit Operations Guide

Basic steps for running the unit.

Seasonal Start-up Procedure

Procedure for resuming operation after shutdown.

Maintenance

Maintenance Instructions

General guidance for unit upkeep and service records.

Inspection Visit After First 500 Hours

Initial inspection checklist for new units.

Troubleshooting Guide