EasyManua.ls Logo

Trane Axiom GEH-E006 - Page 15

Trane Axiom GEH-E006
124 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WSHP-SVX01Y-EN
15
Figure 3. Clearance GEV .5 to 5 tons
36"
1"
1"
UNIT FRONT
LEFT
RETURN
TOP/BACK
SUPPLY
1"
1"
24"
UNIT FRONT
36"
RIGHT
RETURN
TOP/BACK
SUPPLY
24"
A 24 inch clearance from other mechanical and electrical equipment
(where shown) is recommended for most unit configurations. This
will enable panel removal from the unit for service/maintenance.
The 24–inch side clearance on GEVG 0.5-5T models is for optimal
access only. Side clearance is not a requirement as most
components can be accessed from the front of the unit.
A 1 inch minimum clearance between the filter rack and any
obstacle is required for units in a free return application to provide
proper air flow to the air-to-refrigerant coil. A 12 inch minimum
clearance between the filter rack and any obstacle should be
provided to properly attached ductwork.
The 1 inch dimension shown in the back of the unit represents the
supply duct collar for the back supply option. This clearance is
needed to clear these flanges.
Figure 4. Clearance - GEV 6 to 10 Tons
24"
FRONT RETURN
TOP SUPPLY
ACCESS PANEL FOR
SHEAVES AND BELTS
24"
36"
A 24 inch clearance from other mechanical and electrical equipment
(where shown) is recommended for all configurations. The unit may
be serviced through the front access panel or remaining open sides.
Figure 5. Clearance - GEV 12.5 to 25 Tons
24"
CONTROL BOX
UNIT FRONT
18"
FRONT RETURN-AIR
BACK SUPPLY-AIR
36"
18"
24"
A 24 inch clearance from other mechanical and electrical equipment
(where shown) is recommended for all configurations. The unit may
be serviced through the front access panel.