Pre-Start Checklist
Before energizing the unit, the following system
devices must be checked:
Is the high voltage power supply correct and in
accordance with the nameplate ratings?
Is phasing of the unit correct per compressor
rotation (scroll compressor only)?
Is the field wiring and circuit protection the correct
size?
Is the low voltage control circuit wiring correct per
the unit wiring diagram?
Is the piping system clean/complete and correct? (A
recommendation of all system flushing of debris
from the water-to-refrigerant heat exchanger, along
with air purging from the water-to-refrigerant heat
exchanger be done in accordance with the Closed-
Loop/Ground Source Heat Pump Systems
Installation Guide).
Is vibration isolation provided? (i.e. unit isolation
pad, hose kits)
Is unit serviceable? (See clearance specifications in
Unit Dimensions and Weights).
Are the low/high-side pressure temperature caps
secure and in place?
Are all the unit access panels secure and in place?
Is the thermostat in the OFF position?
Is the water flow established and circulating
through all the units?
Is the duct work correctly sized, run, taped,
insulated and weather proofed with proper unit
arrangement?
Is the condensate line properly sized, run, trapped,
pitched and primed?
Is the zone sensor correctly wired and in a good
location?
Does the indoor blower turn freely without
rubbing?
Has all work been done in accordance with
applicable local and national codes?
Has heat transfer fluid been added in the proper
mix to prevent freezing in closed system
application?