4 INSTALLATION
4.1
MOVING AND POSITIONING THE UNIT
The units have been designed to be lifted from above by means of eyebolts and holes in the base members.
Use retractor bars to keep the lifting wires or chains away from the unit.
Figure 2 - Correct lifting procedure for platform 1 units
(sizes from 050 to 085)
Figure 3 - Correct lifting procedure for platform 2 units (sizes
from 100 to 210)