lnsta llation
checklist
CGAH Trane air
cooled
liquid
chiller
This list must
be checked
off
by the installer,
to insure
correct installation
before
the
unit
starts up.
Unit acceptance
o
Check for
damage,
if
any,
on transportation
o
Check for
equipment
shipped
against
delivery
slip
o
Check
lifting
system
Unit
positioning
o
Remove
packaging
o
Check
position
of unit
o
Check
unit is
level
o
Check
clearance
around
condenser
o
Check
clearance
required
for
maintenance
access
o
Check
position
of
dampers
'^\
Chilled
water
circuit
o
Check for leaks
in
chilled
water
pipes
O
Check
thermometer
positioning
o
Check
manometer
positioning
o
Check
chilled
water
flow
rate
balancing
system
o
Check
rinsing
and filling
of
chilled water
pipes
o
Check
pump
operation
and measurements
for
loss
of fluid
Electrical
equipment
o
check
direction
of
ventilator
and
compressor
fan
motors
o
Check
chilled
water
pump
drive rotation
o
check installation
and
rating
of mains
power
switch/fuse
o
Check
that
electrical
connections
comply with
specifications
o
Check
that
electrical
connections
match
information
on
manufacturer's
identification plate
o
Check
electrical
connections
and
connections
to mains
power
switch
o
Check fuse
on
the evaporator
heating
resistor
,,
o
Thermostatic
heating
check for
chilled water
pipes
n,,,
o
Water
pressure
switch
General
o
Check
availabte
cooling
charge
150%
of
rated
instattation
load)
o
Check with
other
trades
handling
installation
works
Comment:
Signature
:
Order No.:
Work
site:
Name:
Please
return
to
Trane
Agency
with
responsibility
for
equipment
installation
and
set
up