EasyManua.ls Logo

Trane RAUJ-C25 User Manual

Trane RAUJ-C25
132 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SSAAFFEETTYY WWAARRNNIINNGG
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning
equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person
could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that
are attached to the equipment.
April 2020
SSSS--SSVVXX1111KK--EENN
Installation, Operation, and Maintenance
Split System
Cooling Condensers 20 to 120 Tons
Remote Chillers 20 to 120 Tons
RAUJ-C20
RAUJ-C25
RAUJ-C30
RAUJ-C40
RAUJ-C50
RAUJ-C60
RAUJ-C80
RAUJ-D10
RAUJ-D12

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Trane RAUJ-C25 and is the answer not in the manual?

Trane RAUJ-C25 Specifications

General IconGeneral
BrandTrane
ModelRAUJ-C25
CategoryAir Conditioner
LanguageEnglish

Summary

Introduction

Proper Field Wiring and Grounding Required

Critical safety instructions for electrical installation and grounding.

Personal Protective Equipment (PPE) Required

Mandatory safety gear for technicians performing work.

General Information

Installation Mechanical

Rigging and Lifting

Safe procedures for moving and positioning the unit.

Refrigerant Piping Requirements

Guidelines for installing refrigerant lines and components.

Leak Testing Procedure

Steps for verifying the integrity of refrigerant lines.

Installation Mechanical — EVP

Installation Electrical

Wiring Requirements

General guidelines for field wiring and grounding.

Power Wire Sizing and Protection Devices

Selecting appropriate wires and protective devices.

Start-Up

Pre-Start Checklist

Essential steps before initial unit operation.

System Evacuation Procedures

Steps for removing air and moisture from the refrigerant system.

Standing Vacuum Test

Procedure to verify proper system evacuation.

Preliminary Expansion Valve Adjustment

Setting the expansion valve for optimal performance.

Compressor Start-Up (All Systems)

Procedures for safely starting compressors.

Maintenance

Wiring Diagrams

Field Connection Diagrams

Detailed wiring diagrams for various system configurations.

Related product manuals