RTWB-SVN01B-E4
4
3
Contents
9
18
28
General Information
Literature change history
Unit inspection
Inspection checklist
Loose parts inventory
Unit description
Installation overview
Installation – Mechanical
Storage
Location requirements
Access restrictions
Moving and rigging
Lifting procedure
Isolation pads
Shipping items
Unit leveling
Water piping
Water pressure-drop data
Water treatment
Water pressure gauges and thermometers
Water pressure-relief valves
Flow sensing devices
Refrigerant pressure-relief valve venting
Thermal insulation
Installation – Electrical
General recommendations
Power supply wiring
Compressor-motor phase sequencing
Module and control panel connectors
Interconnecting wiring (field wiring required)
Operating Principles – Mechanical
General
Unit Start-Up Procedure
Daily unit start-up procedure
Seasonal unit start-up procedure
Unit Shutdown Procedure
Daily unit shutdown procedure
Seasonal unit shutdown procedure
Periodic Maintenance
Overview
Weekly maintenance and checks
Maintenance Contract and Training
29
32
33