SAFETY WARNING
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-
conditioning equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment
by an unqualified person could result in death or serious injury.When working on the equipment, observe all precautions in the literature and
on the tags, stickers, and labels that are attached to the equipment.
Packaged Rooftop Air Conditioners
Precedent™- Electric/Electric
3–10Tons–60Hz
Model Numbers
TSC037E - TSC067E THC037E - THC067E
TSC036E - TSC060E THC036E - THC072E
TSC072F - TSC120F THC120E
THC048F - THC102F
RT-SVX22M-EN
September 2013
Installation, Operation,
and Maintenance

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Trane TSC037E and is the answer not in the manual?

Trane TSC037E Specifications

General IconGeneral
BrandTrane
ModelTSC037E
CategoryAir Conditioner
LanguageEnglish

Summary

Warnings, Cautions and Notices

Safety Warnings and Precautions

Groups safety warnings, PPE, environmental concerns, and refrigerant practices.

Model Number Decoding

Standard Model Number Digits

Explains digits 1-25 for standard model numbers.

17 Plus Model Number Decoding

17 Plus Model Number Digits

Explains digits 1-25 for 17 Plus model series.

Installation Procedures

Pre-Installation Safety and Preparation

Covers fiberglass handling, hazardous voltage, lifting safety, and unit lift precautions.

Rigging and General Unit Requirements

Covers rigging procedures, fork pocket usage, and general installation steps.

Field Wiring and Power Requirements

Covers field wiring, grounding, main unit power, and optional TBUE wiring.

Pre-Start Procedures

Pre-Start Checklist and Safety

Covers essential pre-start checks, safety warnings, voltage imbalance, and electrical phasing.

Component Operation Checks

Details checks for scroll compressors, crankcase heaters, and ReliaTel controls.

Economizer Control Test Procedures

Provides test steps for economizer actuators and sensors.

Electromechanical Control Test Procedures

Outlines test procedures for electromechanical controls.

Unit Start-Up

Verifying Proper Air Flow

Explains how to check and adjust air flow for direct drive and belt drive fans.

Units with Belt Drive Indoor Fan

Details start-up procedures for units with belt drive indoor fans.

Compressor Start-Up

Continues compressor start-up procedures, including heater checks.

Units with Direct Drive Indoor Fan

Details start-up procedures for units with direct drive indoor fans.

Final System Setup

Covers final checks for system components, controls, and panel security.

Troubleshooting

ReliaTel™ Control Troubleshooting

Guides service personnel through RTRM diagnostics and status checks.

Unit Economizer Control (ECA) Troubleshooting

Provides test steps for ECA resistors and sensors under electromechanical control.

Troubleshooting Direct Drive Plenum Fan

Provides a step-by-step guide for troubleshooting the direct drive plenum fan.

Failure Condition Diagnosis

Lists causes and checks for cooling, service, and simultaneous heat/cool failures.