EasyManua.ls Logo

Trane TUH1B060A9H31B - User Manual

Trane TUH1B060A9H31B
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
*UH1B040A9H21B
*UH1B060A9H31B
*UH1B080A9H31C
*UH1C100A9H41B
*UH1D120A9H51B
High Efficiency Single Stage Upflow/ Horizontal
and Downflow/ Horizontal Gas-Fired, Direct Vent
Condensing Furnaces
ALL phases of this installation must comply with NATIONAL, STATE AND LOCAL CODES
IMPORTANT — This Document is customer property and is to remain with this unit.
Please return to service information pack upon completion of work.
Installer’s Guide
*DH1B040A9H21B
*DH1B065A9H31B
*DH1C085A9H41B
*DH1D110A9H51B
*__First letter may be “A” or “T”
A341624P15
UPFLOW
*UH1-H
UPFLOW/HORIZONTAL
*DH1-H
DOWNFLOW
DOWNFLOW/HORIZONTAL
18-CD33D1-4
Question and Answer IconNeed help?

Do you have a question about the Trane TUH1B060A9H31B and is the answer not in the manual?

Trane TUH1B060A9H31B Specifications

General IconGeneral
BrandTrane
ModelTUH1B060A9H31B
CategoryFurnace
LanguageEnglish

Summary

SAFETY SECTION

Carbon Monoxide Poisoning Hazard

Warning regarding carbon monoxide poisoning from venting system failures. Follow specific steps.

GENERAL INSTALLATION INSTRUCTIONS

LOCATION AND CLEARANCES

AIR FOR COMBUSTION AND VENTILATION

Unconfined vs. Confined Spaces

Defines unconfined and confined spaces for furnace installation and requirements for air supply.

DUCT CONNECTIONS AND RETURN AIR SYSTEMS

GENERAL VENTING

Venting Requirements and System Types

Essential venting principles, including positive-pressure systems, Category IV requirements, and common venting scenarios.

VENT AND INLET AIRCONNECTIONS

DIRECT VENT TERMINAL CLEARANCES

NON-DIRECT VENT TERMINAL CLEARANCES

CONDENSATE DRAIN INSTRUCTIONS

Vertical and Horizontal Drain Connections

Instructions for connecting condensate drain lines for upflow, downflow, and horizontal furnace configurations.

ELECTRICAL CONNECTIONS AND WIRING

Electrical Connections

Guidelines for making electrical connections, including power supply, grounding, and polarity sensitivity.

GAS PIPING INSTALLATION

Gas Supply Connections and Pressure Testing

Instructions for connecting gas supply, national codes, and procedures for pressure testing the system.

START UP AND ADJUSTMENT

Preliminary Inspections

Checks to perform before starting up the furnace, including duct connections, filters, and venting.

Sequence of Operation

Describes the step-by-step process of the furnace operation from thermostat call to shutdown.

FURNACE OPERATION AND CONDITIONS

INTEGRATED FURNACE CONTROL ERROR FLASH CODES

Related product manuals