SAFETY WARNING
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-
conditioning equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment
by an unqualified person could result in death or serious injury. When working on the equipment, observe all precautions in the literature and
on the tags, stickers, and labels that are attached to the equipment.
Packaged Rooftop Air Conditioners
Voyager
Electric/Electric
12.5 to 25 Tons, 60/50Hz
February 2017
RT-SVX25M-EN
Installation, Operation,
and Maintenance
Model Number:
TS*150–301
TH*150-300
Question and Answer IconNeed help?

Do you have a question about the Trane Voyager THD150G and is the answer not in the manual?

Trane Voyager THD150G Specifications

General IconGeneral
BrandTrane
ModelVoyager THD150G
CategoryAir Conditioner
LanguageEnglish

Summary

Introduction

Field Wiring and Grounding Safety

Hazards and requirements for field wiring and grounding.

Model Number Descriptions

Model Number Description

General Information

Unit Inspection and Storage Precautions

Guidelines for unit inspection upon arrival and storage.

Fiberglass Wool Safety and Unit Clearances

Warnings about fiberglass wool and importance of unit clearances.

Unit Weights

Rigging Procedures and Safety

Safe rigging procedures, including warnings for heavy objects and improper lifts.

Installation

Foundation and Ductwork Requirements

Foundation, roof support, water damage, and ductwork installation guidelines.

General Unit Installation Requirements

Checklist for successful commercial unit installation, including wiring safety.

Field Power Wiring Guidelines

Guidelines for field installed power wiring, emphasizing copper conductors.

Main Unit Power Wiring Options

Standard, optional TBUE wiring, and control wiring.

Control Power Transformer and Field Wiring

Use of control power transformer and field installed control wiring.

Electrical Safety and Voltage Checks

Warnings about hazardous voltage, voltage imbalance, and electrical phasing.

Service Safety and Compressor Operation

Safety during live component work and compressor crankcase heater function.

Factory-Mounted Unit Options

Circuit Breaker and Unit Disconnect Installation

Installation of factory-mounted circuit breakers and disconnects, including capacitor safety.

Field Wiring for Disconnects and Control Wiring

Field wiring for power entrance and control wiring routing.

Return Air Smoke Detector Installation

Steps for installing the return air smoke detector assembly.

Pre Start

Test Modes and Procedures

Describes three test modes for component checks.

Verifying Air Flow and ReliaTel Controls

Procedures for verifying airflow and using ReliaTel controls for testing.

Start Up

Economizer and Compressor Start-Up

Steps for starting up the economizer and compressors.

Heating Start-Up and VAV Applications

Procedures for heating start-up and VAV system operation.

Final System Setup and Checks

Final checks before leaving the unit after startup.

Maintenance

Fan Belt Adjustment for Belt Drive Units

Procedure for adjusting fan belt tension and measurement ranges.

Troubleshooting

Service Safety and ReliaTel Control Diagnostics

Safety warnings and steps for ReliaTel control diagnostics.

System Status Checkout Procedures

Methods for checking system status using LED indicators.