Reassembly
CVHS-SVN04E-EN 23
Final Installation Procedures
After the chiller has been moved to the equipment room
and reassembled under Trane supervision, leak testing,
and evacuation can be performed by Trane or under Trane
supervision. Upon verification of leak tightness,
installation can proceed for unit piping, wiring, etc. After
installation has been completed, fill out CTV-ADF001*-EN
(CenTraVac™ Installation Completion Check Sheet and
Request for Trane Service) to schedule the startup; the
chiller commissioning process can be completed by Trane
or under the supervision of authorized Trane personnel.
Note: CTV-ADF001*-EN is also included in the “Forms”
section of CVHS-SVX01*-EN (Installation,
Operation, and Maintenance: Series S™ Water-
Cooled CenTraVac Chillers with Tracer AdaptiView
Control).

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Trane Water-Cooled CenTraVac S Series and is the answer not in the manual?

Trane Water-Cooled CenTraVac S Series Specifications

General IconGeneral
BrandTrane
ModelWater-Cooled CenTraVac S Series
CategoryChiller
LanguageEnglish

Related product manuals