EasyManua.ls Logo

Trek CHECKPOINT SL - Page 14

Trek CHECKPOINT SL
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2022 Checkpoint SL/SLR
13
5. Apply grease to the bolt (8) as shown below. Do not
apply grease to the threads.
8
6. Install the hardware as shown on page 12. Torque
the bolt (8) to 15Nm.
NOTE: Torque the bolt to the value shown in this
manual (15Nm). Some early production models have
an incorrect torque value etched into the head of this
bolt.
7. Reinstall the IsoSpeed covers (2).
8. Allow the assembly to cure for 24 hours at room
temperature (72°F/22°C).
IsoSpeed — SLR (continued)

Related product manuals