Chapter II Instrument composition and maintenance requirements
2.1 Instrument composition
The instrument is composed of main unit, two signal cable, transducer
and scanning trolley etc.
2.2 Preparation before operation
Firstly, take the instrument out of the casing. During Thickness
Test and Diameter Test, connect the main unit to the main unit. During
Rebar Scan, the main unit is connected with the probe and scanning
trolley. Then press the key on the keyboard. Start-up screen
appears.
2.3 Replace battery
When insufficient electric quantity or voltage is less than 7.0V
are showed on start-up screen, please replace the battery. Pay attention
not to reverse the battery polarity.
2.4 Precautions
1. Avoid water in.
2. Avoid high temperature >50 .
3. Avoid being near very strong magnetic field, e.g. large
electromagnet and transformer etc.
4. When the instrument is not used for a long time, please take
out of the battery to avoid damaging the circuit due to battery
leakage.
5. Without permission, please not open the instrument casing.
Otherwise, user will responsible for the consequence!