EasyManua.ls Logo

twotrees SP-5 - Page 27

Default Icon
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7. Assemble Filament 耗材装配 :
7.1. Insert the Teflon tube into the joint.
Note: Ensure you really plug it 5-6 cm to the bottom
四氟插入到底确保插到
7.2. Insert the filament through the filament sen
sor and BGM extruder.
耗材穿过断料检测和BGM挤出机
8. Test The Output 检测耗材输出
8.1. Preheat” → Choose among “1/5/10” (Click to
change) Add” (Click the “Addto increase the
temperature that the filament needs, generally
around 200).
预热→ 选择1/5/10(点击可更换)→ 增加(点击
增加增加到耗所需的温200左右
6. Leveling: 调平
6.1. “Leveling” → click 5 points and
level them one by one
5
6.2. Insert a piece of A4 paper to see if it can
slide smoothly, otherwise there is a scratch
and you need to rotate the nuts manually
塞一张A4纸是否滑动纸上有刮痕,需要手动旋转螺母
SP-5 22TWOTREES