EasyManua.ls Logo

Ultra Optics MR3 - Start Up Procedure; AIR; POWER; WATER

Default Icon
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Start Up Procedure
AIR:
Slowly press the orange rocker on the air
valve to the down position to supply air to
the machine.
The valve is located on the left side of the
machine.
Check air pressure regulators inside the front door.
Left 80 PSI | Right 60 PSI
POWER:
Press the red rocker switch, just to the left
of the touchscreen, to the ON position.
WATER:
Empty the water buckets and wipe out
with 90% IPA or bleach, weekly to kill any
algae and bacteria.
Fill the clean water bucket with deionized
water that is 1MΩ or better.
After refilling the buckets, prime the wash
pump. Refer to page 23
1

Related product manuals