16
INSTALLATION INSTRUCTIONS
ATTENTION!
This boiler is intended solely for
the use for which it was expressly
considered improper and therefore
This boiler heats water at a temper
ature lower than the atmospheric
Before connecting the boiler, have pro-
fessionally qualied personnel:
a) Thoroughly wash all the piping of
the system to remove any residues
or impurities which could jeopard
ise proper operation of the boiler,
b) Check that boiler is set up to operate
with the available type of fuel.
This can be seen written on the
package and on the technical feature
plate;
c) Check that the chimney/ue has an
appropriate draught, without any bot-
tlenecks, and that no exhausts from
other appliances are inserted, unless
the ue has been
implemented to accommodate sev-
eral utilities according to specific
standards and regulations in force.
Only after this check can the tting
between the boiler and chimney/ue
be mounted;
ATTENTION!
If there is dust and/or if there are
aggressive/corrosive vapours
present in the installation room,
the appliance must be protected
suitably and must be able to
operate independently from the air
ATTENTION!
Only mount the appliance on a closed
wall, made of non-ammable materi-
al, at, vertical so that the minimum
distances required for installation and
maintenance can be observed.
The boiler must be connected to a cen-
tral heating system and/or domestic hot
water supply network compatible with its
efciency and output.
It must be installed by a professionally qualied
technician,
observing all local and/or national laws published
PREVENTIVE VERIFICATION AND
VERIFICATION AND ADJUSTMENT
OPERATIONS
NOTE!
For further details relating to the standards, rules
and regulations for safe installation of the thermal
unit, refer to the section "Technical Information"
NOTE!
Further details in the section
NOTE!
Further details in the section