EasyManua.ls Logo

Unigas G400A - MultiBloc MB-DLE - Assembling the gas train

Default Icon
128 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PART II: INSTALLATION
17
MultiBloc MB-DLE - Assembling the gas train
4 Proving system pressure switch - PGCP 9 Antivibration joint (*optional)
5 Pressure switch PGMAX: mandatory for MBE, optional for VGD and MB-DLE 10 Manual valve(*optional)
MULTIBLOC DUNGS
MB-DLE 405..412
MB-DLE 415..420
Mounting
1 Mount flange onto tube lines: use appropriate sealing agent
2 Insert MB-DLE: note position of O rings
3 Remove MultiBloc between the threaded flanges
4 After installation, perform leakage and functional test
5 Disassembly in reverse order
A
B
C
D
(A)
MOUNTING POSITIONS
A B
MB-DLE 405.. 412
(B) (C) (D)
MB-DLE 415.. 420
(O-Ring)