PART II: INSTALLATION
17
MultiBloc MB-DLE - Assembling the gas train
4 Proving system pressure switch - PGCP 9 Antivibration joint (*optional)
5 Pressure switch PGMAX: mandatory for MBE, optional for VGD and MB-DLE 10 Manual valve(*optional)
MULTIBLOC DUNGS
MB-DLE 405..412
MB-DLE 415..420
Mounting
1 Mount flange onto tube lines: use appropriate sealing agent
2 Insert MB-DLE: note position of O rings
3 Remove MultiBloc between the threaded flanges
4 After installation, perform leakage and functional test
5 Disassembly in reverse order
A
B
C
D
(A)
MOUNTING POSITIONS
A B
MB-DLE 405.. 412
(B) (C) (D)
MB-DLE 415.. 420
(O-Ring)