PART II: INSTALLATION
26
1. Inlet G1/2
2. To the nozzle G1/2
3. Return G1/2
4. Pressure gauge port G1/4
5. Vacuum gauge port G1/4
6. Pressure governor
Connecting the oil flexible hoses to the pump
To connect the flexible oil hoses to the pump, proceed as follows, according to the pump provided:
1 remove the closing nuts A and R on the inlet and return connections of the pump;
2 screw the rotating nut of the two flexible hoses on the pump being careful to avoid exchanging the lines: see the arrows marked
on the pump.
For further information, refer to the technical documentation of the pump.
.
Diesel filters
Suntec TA..
Oil viscosity 3 ÷ 75 cSt
Oil temperature 0 ÷ 150°C
Min. suction pressure - 0.45 bar to avoid gasing
Max. suction pressure 5 bar
Max. return pressure 5 bar
Rotation speed 3600 rpm max.
Suntec T+TV Suntec TA
Item Note Connection Max. operating
pressure
Max. operating
temperature
Filtering
degree
Protec-
tion
5 20151PE (*)
-
3/8” 1 bar -20, 60 °C
100 μ
-
6 20201PL (*)
-
3/8” 1 bar -20, 60 °C
100 μ
-
7 GA70501
-
1” 4 bar 90 °C
100 μ
IP65
(*) Supplied per pilot diesel fuel if present